Appendix D: Change History
Date Version Change Description
1 Mar 90 0.0 Rough draft of the key practice tables; distributed to the
CMM User Working Group. Version for review at the March
1990 CMM Workshop.
1 May 90 0.1 Rough draft of the key practice tables appendix to
incorporate recommendations made at the March 1990 CMM
Workshop against Version 0.0. Version for internal SEI peer
review.
6 Jun 90 0.2 Draft, revision to the key practice tables to incorporate
comments from the SEI peer review of Version 0.1. Version
distributed to the CMM User Working Group for its review and
comments. (Baselined version of the key practice tables).
26 Feb 91 0.3 Draft, revision to the key practice tables (Level 2 key
process areas only) to incorporate comments from the CMM
User Working Group and the Questionnaire Advisory Board made
against Version 0.2. Version for internal SEI peer review.
Rough draft (first version) of overview and definitions to
assist in the SEI peer review of the key practice tables,
Level 2 key process areas.
18 Mar 91 0.4 Draft, revision to the key practice tables, Level 2 key
process areas to incorporate comments from the SEI peer
review of Version 0.3. Version distributed to the CMM User
Working Group and Questionnaire Advisory Board for their
review and comments. Rough draft, revision of overview and
definitions to assist the CMM User Working Group and the
Questionnaire Advisory Board in their review of the key
practice tables, Level 2 key process areas.
10 Apr 91 0.41 Draft, revision to the key practice tables (Level 3 key
process areas only, except Software Product Engineering key
process area is not included) to incorporate comments from
the CMM User Working Group and the Questionnaire Advisory
Board made against Version 0.2. Version for internal SEI
peer review.
22 Apr 91 0.5 Draft, revision to the key practice tables, Level 3 key
process areas (except the Software Product Engineering key
process area is not included) to incorporate comments from
the SEI peer review of Version 0.41. Version distributed to
the CMM User Working Group and Questionnaire Advisory Board
for their review and comments. Rough draft, revision of
overview and definitions to assist the CMM User Working
Group and the Questionnaire Advisory Board in their review
of the key practice tables, Level 3 key process areas.
17 May 91 0.51 Draft, revision to the Level 2 key practice areas to
incorporate comments from the CMM User Working Group made
against Version 0.4 and make practices of each key process
area at a single maturity level. Version for internal SEI
peer review.
23 May 91 0.52 Draft, revision to the key practice tables (initial version
of Software Requirements Management key process area, and
consolidation of Software Requirements Analysis, Software
Design, and Software Testing key process areas and addition
of coding practices into the single key process area,
Software Product Engineering) to incorporate comments from
the CMM User Working Group and the Questionnaire Advisory
Board. Version for internal SEI peer review.
5 Jun 91 0.53 Preliminary baseline, revision to the Level 2 key practice
areas to incorporate comments from the internal SEI peer
review of Version 0.51. Version submitted to SEI's
Information Management.
7 Jun 91 0.54 Draft, revision to the key practice tables (initial version
of Software Project Management key process area only).
Version for internal SEI peer review.
14 Jun 91 0.6 Draft, revision to the key practice tables to incorporate
comments from the SEI peer review of Software Requirements
Management (Version 0.52), Software Project Management
(Version 0.54), and Software Product Engineering (Version
0.52) key process areas; incorporated Version 0.53 of other
Level 2 key process areas. Version distributed to the CMM
User Working Group and Questionnaire Advisory Board for
their review and comments. Rough draft, revision of
overview and definitions to assist the CMM User Working
Group and the Questionnaire Advisory Board in their review
of the key practice tables (Software Requirements
Management, Software Project Management, and Software
Product Engineering key process areas). Significant changes
include (1) restructuring key process area practice tables
by changing the common key features, (2) modifying the set
of key process areas, and (3) rearranging the practice
statements so that each key process area contains practices
for a single maturity level.
21 Jun 91 0.61 Draft, revision to the key practice tables (Level 4 and 5
key process areas only) to incorporate comments from the CMM
User Working Group and the Questionnaire Advisory Board made
against Version 0.2. Version for internal SEI peer review.
28 Jun 91 0.7 Draft, revision to the key practice tables appendix, (Level
4 and 5 key process areas only) to incorporate comments from
the SEI peer review of Version 0.61. Version distributed to
the CMM User Working Group and Questionnaire Advisory Board
for their review and comments.
10 Jul 91 0.71 Draft, revision to the Level 3 key process areas and
Software Requirements Management key process area to
incorporate comments from the CMM User Working Group made
against Versions 0.5 and 0.6; make practices of each key
process area at a single maturity level; and renamed three
key process areas (Software Requirements Management to
Requirements Management, Software Project Management to
Integrated Software Management, and Technical Team
Coordination to Intergroup Coordination). Version for
internal SEI peer review.
14 Jul 91 0.72 Draft, revision to the Level 3 key process areas and
Software Requirements Management key process area to
incorporate comments from the internal SEI peer review
against Version 0.71. Version for internal SEI peer review.
15 Jul 91 0.73 Draft, revision to the Level 3 key process areas and
Software Requirements Management key process area to
incorporate comments from the internal SEI peer review.
15 Jul 91 0.74 Preliminary baseline, revision to the Level 3 key process
areas and Software Requirements Management key process area
(reformatting and fixing editorial defects). Version
submitted to SEI's Information Management.
22 Jul 91 0.75 Draft, revision to the Level 4 and 5 key process areas to
incorporate comments from the CMM User Working Group made
against Version 0.7. Version for internal SEI peer review.
30 Jul 91 0.76 Preliminary baseline, revision to Level 4 and 5 key process
areas to incorporate comments from internal SEI peer review.
Version submitted to SEI's Information Management.
30 Jul 91 0.77 Draft, revision to the preliminary baseline of the
Requirements Management key process area to incorporate
comments from the 30 July 1991 Questionnaire Advisory Board
meeting. Version for internal SEI peer review.
5 Aug 91 0.78 Draft, revision to Version 0.77 of the Requirements
Management key process area to incorporate comments from the
31 July 1991 Questionnaire Advisory Board meeting. Version
for internal SEI peer review.
7 Aug 91 0.79 Revised preliminary baseline of the Requirements Management
key process area to incorporate comments from the
Questionnaire Advisory Board and the internal SEI peer
review against Version 0.78.
7 Aug 91 0.80 Draft, revision of overview and definitions to incorporate
comments received from the CMM User Working Group and the
Questionnaire Advisory Board in their review of Versions
0.4, 0.5, and 0.6 and restructure the document. Version for
internal SEI peer review.
15 Aug 91 1.0 Baseline version for public release.
1 Sep 92 1.01 Draft, revision to Version 1.0 based on change requests
received by 17 January 92 and recommendations from the CMM
Workshop held 6-7 April 92. Training Program key process
area replaced with Skills Building. Title of Technology
Innovation changed to Technology Change Management.
8 Dec 92 1.02 Draft, revision to Version 1.01 to incorporate
recommendations of CMM Advisory Board and comments from the
internal SEI peer review. Training Program key process area
restored, with minor upgrades to address skills- building
concerns. Title of Process Measurement and Analysis key
process area changed to Quantitative Process Management.
Version for internal SEI peer review.
14 Dec 92 1.03 Draft, revision to Version 1.02 to incorporate comments from
the internal SEI peer review. Title of Quality Management
key process area changed to Software Quality Management.
Version for internal SEI peer review.
18 Dec 92 1.04 Draft, revision to Version 1.03 to incorporate comments from
the internal SEI peer review. Distributed to reviewers of
version 1.01 and the CMM Advisory Board for comment and
feedback.
15 Jan 93 1.05 Draft, revision to Version 1.04 to incorporate
recommendations of CMM Advisory Board and comments from the
internal SEI peer review. Version for internal SEI peer
review.
10 Feb 93 1.1 Baseline version for public release.
Table of contents
Appendix C
| |
|